Screening of the geothermal utilization, evaluation of the thermal groundwater bodies and preparation of the joint aquifer management plan in the Mura-Zala basin Pregled rabe geotermalne ener
Basic information
-
Brief description of the consultancy firmWorking group meetings, Joint 3-lingual geothermal database, Chemical sampling of the thermal water, Hydraullic and temperature measurements in boreholes, Questionnaire for the thermal water users energetic overview, Screening of the existent heat pump installations, Heat pump workshops, Preparation of the project webpage.
- Planned start of the project 01.05.2009 Expected end of project 30.06.2011
- Duration 25 (Month(s) )
Budget
- Program Total Budget 685468 Project EU-Funding 461357 Percent: 67