ŠVENDUBRė BCP AND BUGIEDA BERTH
Construction of Švendubrė Seasonal River Border Crossing Point and Bugieda Berth
Perustiedot
-
Lyhyt kuvaus konsulttiyrityksestäThe infrastructure and conditions for the border checking at the Švendubrė-Privalka state border river crossing point (Lithuania-Belarus) are poor and insufficient; the state border protection during the out-of-season period and at night is not ensured. This negatively affects the travelling persons flow and the Lithuanian-Belarusian cross-border cooperation. The project aims at improving (creating) the infrastructure of the Švendubrė Seasonal River border crossing point (BCP) and ensuring the relevant inland waters border security by construction and installation of the border checks infrastructure and the berth for border guards and other vessels in the vicinity of Bugieda.
- Projektin suunniteltu aloitus 01.08.2012 Projektin odotettu loppu 31.10.2015
- Kesto 38 (kuukaudet))
Talousarvio
- Ohjelman / ehdotuspyynnön kokonaisbudjetti 3500000 Hankkeen EU-rahoitus 3150000 Prosentti: 90
kumppanit
Asiakirjat
-
tällä tietueella ei ole tällä hetkellä asiakirjoja