ŠVENDUBRė BCP AND BUGIEDA BERTH
Construction of Švendubrė Seasonal River Border Crossing Point and Bugieda Berth
Grunnupplýsingar
-
Stutt lýsing á ráðgjafarfyrirtækinuThe infrastructure and conditions for the border checking at the Švendubrė-Privalka state border river crossing point (Lithuania-Belarus) are poor and insufficient; the state border protection during the out-of-season period and at night is not ensured. This negatively affects the travelling persons flow and the Lithuanian-Belarusian cross-border cooperation. The project aims at improving (creating) the infrastructure of the Švendubrė Seasonal River border crossing point (BCP) and ensuring the relevant inland waters border security by construction and installation of the border checks infrastructure and the berth for border guards and other vessels in the vicinity of Bugieda.
- Fyrirhuguð upphaf verkefnis 01.08.2012 Áætluð verklok 31.10.2015
- Lengd 38 (Mánuðum))
Fjárhagsáætlun
- Heildarfjárhagsáætlun áætlunarinnar / símtalið 3500000 Verkefni ESB-fjármögnun 3150000 Hlutfall: 90
Samstarfsaðilar
Skjöl
-
eins og er eru engin skjöl tiltæk fyrir þessa skrá
![Construction of Švendubrė Seasonal River Border Crossing Point and Bugieda Berth](https://funds-navigator.eu/frontend/images/avatar/bp-project-no-logo-default.png)