C933
Biking on the History Trail
INTERREG V-A SK-CZ/2016/03
Grunnupplýsingar
-
Stutt lýsing á ráðgjafarfyrirtækinuProject is based on the realized project of biking trail construction which was implemented in the programme period 2007-2013. Implemented project aimed to connect biking trails in CZ and SK to produce 50 km long trail BEVLAVA. Proposed project continues to build the trail on the Czech side BrumovBylnice to Svatý Štěpán and continues to connect onto BEVLAVA trail going from Nemšová to Trenčín and its castle. Project´s main idea is to connect two castles – Brumov and Trenčín castle. At the same time, other significant objects will be connected and propagated that are along this trail.
- Fyrirhuguð upphaf verkefnis 01.02.2018 Áætluð verklok 31.12.2019
- Lengd 22 (Mánuðum))
Fjárhagsáætlun
- Heildarfjárhagsáætlun áætlunarinnar / símtalið 5109782 Verkefni ESB-fjármögnun 4343315 Hlutfall: 85
Samstarfsaðilar
Skjöl
-
eins og er eru engin skjöl tiltæk fyrir þessa skrá