CAMIS
Coordinated activities for management of of the river Isonzo/ Soča
Grunnupplýsingar
-
Stutt lýsing á ráðgjafarfyrirtækinuThe catchment area of the River Soca is a cross-border nature and therefore requires consultation and coordination, which is formally defined in bilateral agreements. In substance, the project was divided into the analytical part of the research of river morphology and hydraulics (1 2D hydrodynamic model), the second part is devoted to the analysis of water quality, updating databases on the river.
- Fyrirhuguð upphaf verkefnis 01.08.2012 Áætluð verklok 31.01.2015
- Lengd 29 (Mánuðum))
Fjárhagsáætlun
- Heildarfjárhagsáætlun áætlunarinnar / símtalið 1431259 Verkefni ESB-fjármögnun 1216570 Hlutfall: 85
Samstarfsaðilar
Skjöl
-
eins og er eru engin skjöl tiltæk fyrir þessa skrá