THNS
Study of a high-quality rapid transit system between Colmar (F) and Breisach (D)
Basic information
-
Brief description of the consultancy firmThe high volume of car traffic and the high cost of bringing the railway line between Colmar and Freiburg back into service make it necessary to establish a high-quality transport system, as this is the only mode of public transport suited to the region's economic and demographic structure. The project involves performing a final study before this system is introduced.
- Planned start of the project 01.07.2015 Expected end of project 31.12.2017
- Duration 29 (Month(s) )
Budget
- Program Total Budget 307500 Project EU-Funding 153750 Percent: 50
Partners
DOCUMENTS
-
there are currently no documents available for this record