WATER HABITAT REHABILITATION AT NAGY-SZéKSóS-LAKE
Water habitat rehabilitation at Nagy-Széksós-Lake
Basic information
-
Brief description of the consultancy firmThe project supports both habitat reconstruction and water habitat rehabilitation. As a result of opening the current reeds of nearly 100 hectares besides Nagy-Széksós-Lake and the clear water surface thus produced, former avifauna is expected to resettle. The project also encouraged the establishment of a pilot plant of eco-farming, entailing the construction of a buffalo breeding farm beside the Nagy-Széksós-Lake area, according to the model of the buffalo reserves at Kápolnapuszta and Dévaványa. Observation towers were built in order to increase tourist attractions; thus the nature protection area and eco-farming can be observed. Besides short-term results, however, the unmatched treasure the protection of which is made possible by project support, is not negligible at all.
- Planned start of the project 30.11.-0001 Expected end of project 30.11.-0001
- Duration 0 (Month(s) )
Budget
- Program Total Budget 1888140
Partners
DOCUMENTS
-
there are currently no documents available for this record